Skip to product information
1 of 8

Kichae 36 Inch Drop in Kitchen Sink - 36x22 Drop Sink 16 Gauge Stainless Steel Ledge Workstation Single Bowl Topmount Overmount Handmade Basin

Kichae 36 Inch Drop in Kitchen Sink - 36x22 Drop Sink 16 Gauge Stainless Steel Ledge Workstation Single Bowl Topmount Overmount Handmade Basin

Quantity
Regular price $433.55
Regular price Sale price $433.55
Sale Sold out
  • 24/7 Customer Support
  • Risk-Free 30-Day Returns
  • Fast & Reliable U.S. Shipping

30-Day Hassle-Free Returns

Not satisfied? Return your order within 30 days for a full refund or exchange — simple and easy.

✔ Easy return process

✔ Fast refunds

✔ No hidden conditions

Fast U.S. Shipping

We ship within the United States only — no international delays.

✔ Processing time: 1–2 business days

✔ Delivery time: 3–7 business days

✔ Real-time tracking available

👉 Track your order anytime from the header via Track Order

About This

  • Premium Quality Material 36 Drop In Kitchen Sink: 16-Gauge thick grade T304 stainless steel for durability, performance and aesthetics. Bottom rinse grid to prevent dents and scratches for long lasting use in your busy kitchen.Commercial Grade satin finish, corrosion and rust-resistant, easy to clean and long-lasting.
  • Spacious Single Bowl Workstation Sink: 36 inch drop in sink, Deep single bowl sink with offset center drain creates an uninterrupted workspace for washing your largest cookware, like stock pots and baking sheets.This 36 x 22 inch drop workstation sink with steps which overhanging lips on the front and back as a track for sliding the built-in accessories convert your sink to a workspace. The drop sink can be switched to a cutting board or a separate sink mode.
  • Engineered For Easy Draining and Slience: The 36 drop sink with center drain gently sloped bottom and X grooves avoids water from pooling in the sink.Heavy duty sound guard undercoating and softer rubber noise reduction padding to absorb vibration and minimize noise when the stainless steel single bowl drop kitchen sink is in use.
  • Drop in Kitchen Sink Exterior Dimensions: 36*22*9 Inch(W*D*H).Minimum Base Cabinet: 39" wide.Standard 3.5" drain opening is available to install garbage disposal unit.Package included:1x drop in kitchen Sink,1xDish Drying Roll-up Rack,1xBaskets Strainers Assembly,1xBottom Grid,Screws and Clips,1x Cutting Board, 1xColander
  • Well-Packed: Each item is wrapped in a specially customized anti-collision foam, to maximize the protection in transporting and avoid potential damage. Our most important goal is to deliver products to you in good condition and satisfy your needs.

Overview

  • Brand : Kichae
  • Color : Stainless Steel-Workstation
  • Material : Stainless Steel
  • Size : 36"x22"x9"
  • Product Dimensions : 22"D x 36"W x 9"H
View full details

Free Shipping

Free Shipping on Orders Over $99
Easy Returns
30-Day Hassle-Free Returns
Secure Payment
Secure & Encrypted Checkout
Customer Support
24/7 Customer Support

WHY CHOOSE US

home   Upgrade smarter. Install easier. Live better.

We design kitchen solutions that are easy to install, built to last, and made for how real homes function every day.

No unnecessary complexity — just smart upgrades that improve your space instantly.

0%

Customer Satisfaction

0+

Kitchen Upgrade Experience

0K+

Kitchens Improved

0+

Modern Kitchen Solutions

Click the Images to Explore Our Collections

Kitchorakitchen FAQ

How fast is shipping in the U.S.?
remove
add
We offer fast U.S. shipping. Most orders arrive within 3–7 business days depending on location.
What is your return policy?
remove
add
We offer a 30-day return policy. Items must be unused and in original condition.
Do I need a professional installer?
remove
add
No. Most products are designed for simple DIY installation. If needed, we can guide you or help arrange professional support.
Are your products easy to install for beginners?
remove
add
Yes. Our products are designed for beginners with simple instructions and minimal tools required.
What kitchen upgrades add the most value?
remove
add
Faucets, lighting, and cabinets provide the highest impact in both functionality and home value.
Do I need permits for installation?
remove
add
Most basic upgrades do not require permits. Structural or plumbing changes may require approval depending on your area.
Strategic Partner

Unlock Exclusive Offers

Be the first to know about new collections and exclusive offers.

Subscribe Now